371,237 EUR
Published
April 20, 2024
Winner found
June 11, 2024
Contract concluded
June 11, 2024
Issued
June 12, 2024
Planned Start Date
July 17, 2024
Planned End Date
April 30, 2025
Construction work for school buildings
CPV codes:
Construction work for school buildings
45214200
The city of Ulm, Germany is seeking a contractor for carpentry work on ventilation cladding. The project includes creating workshop drawings, constructing ventilation cabinets of various types, and installing base claddings in the window area. The contract is expected to run from July 17, 2024, to April 30, 2025. The award criteria is price.
Location:
Website:
Email:
Phone:
Maecenas lectus orci, volutpat quis est nec, convallis malesuada nisi. Phasellus vel massa egestas libero ullamcorper consectetur et et magna. Etiam justo justo, dignissim molestie mattis id, placerat ut ante. Phasellus accumsan maximus purus ac tristique. Vestibulum convallis dui sed pellentesque bibendum. Sed blandit enim erat, eget iaculis nunc faucibus mollis. Duis et nibh vel sapien hendrerit sagittis. Ut non libero feugiat, maximus arcu tempus, interdum purus. Nunc fringilla, mi sed aliquet convallis, eros nisl euismod sem, ut finibus leo diam a ipsum. Aenean nec cursus metus. Vivamus congue orci sollicitudin, scelerisque sem eget, tincidunt nisl. In hac habitasse platea dictumst. Donec iaculis sapien tincidunt scelerisque sodales. Nam sed tortor venenatis, placerat ligula nec, vestibulum lorem. Nunc facilisis rutrum magna posuere maximus.
Location:
Email:
Maecenas euismod arcu ac eros lobortis tincidunt. Sed quis vehicula sapien, et dictum odio. Nulla facilisi. Nunc aliquet dui eget sem posuere lobortis. Curabitur eu pulvinar augue. Ut pharetra placerat metus commodo imperdiet. Nunc id pharetra nunc, in facilisis magna. Vivamus laoreet odio faucibus velit rutrum, eget vulputate turpis molestie. Fusce commodo convallis mi ut pulvinar. In quis leo sed nibh dictum interdum. Nam a mattis neque. Vestibulum commodo odio velit, et lobortis lectus interdum at. Maecenas a posuere purus. Maecenas rhoncus lacus vel ligula lobortis bibendum.
Aenean sed purus scelerisque, blandit felis vitae, consequat turpis. In hac habitasse platea dictumst. Donec finibus porttitor sem sit amet pulvinar. Maecenas efficitur scelerisque placerat. Vivamus et vehicula lacus, et sodales enim. Phasellus tempor nisi eget elit tincidunt, vitae congue mauris tincidunt. Fusce gravida consectetur blandit. Vestibulum ante ipsum primis in faucibus orci luctus et ultrices posuere cubilia curae; Quisque auctor mi id est ultrices, at venenatis massa tempus. Ut ornare consequat neque, ac venenatis tellus faucibus vitae. Etiam imperdiet urna vel egestas suscipit. Phasellus finibus purus dolor, et elementum quam auctor ac. Nunc id mauris eu nulla convallis semper.
Cras leo tortor, sollicitudin id elit vitae, laoreet elementum lectus. Nullam in mauris convallis, ornare augue sed, interdum ante. Donec porttitor quam sem, quis egestas lectus tempor non. Curabitur vitae tellus enim. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Suspendisse sit amet sodales felis, at malesuada urna. Praesent mattis quis purus at lacinia. Duis eget sapien gravida, aliquam justo nec, consectetur mauris. Suspendisse tempus erat ut quam ultricies, pretium ultrices dui bibendum. Maecenas luctus hendrerit leo, vel pellentesque mauris condimentum non.
Trockenbauarbeiten - abgehängte Decken | 1/27/2025 |
Schreinerarbeiten Pinnwände, Kreidewände, Sitzbänke | 12/4/2024 |
Metallbauarbeiten Türen | 10/1/2024 |
Metallbauarbeiten Geländer | 9/30/2024 |
Schreinerarbeiten Pinnwände, Kreidewände, Sitzbänke | 9/16/2024 |
Schlosserarbeiten Außenanlage | 6/29/2024 |
Estricharbeiten | 6/17/2024 |
Metallbau -Schlosserarbeiten | 6/10/2024 |
Schlosserarbeiten Außentreppen | 6/2/2024 |
Trockenbau Abhangdecken GK | 4/20/2024 |
Schlosser Innenbereich | 4/20/2024 |
Trockenbau Decken Akustik Mineralplatten | 4/20/2024 |
Abwasser-, Wasser-, Gasanlagen | 4/20/2024 |
Vorgehängte Betonfertigteilfassade | 4/20/2024 |
Heizung | 4/20/2024 |
Lüftung | 4/20/2024 |
Dachabdichtungsarbeiten | 4/20/2024 |
Trockenbau Abhangdecken Akustik Holzwolle | 4/20/2024 |
Trockenbau Abhangdecken Akustik Holzwolle | 4/20/2024 |
Trockenbauarbeiten | 4/20/2024 |
Bodenbelagsarbeiten | 4/20/2024 |
Sanitärarbeiten | 4/20/2024 |
Trockenbau | 4/20/2024 |
Elektroarbeiten | 4/20/2024 |
Schreinerarbeiten | 4/20/2024 |